Projects

We are proud of our company’s development and rich history. Starting as a small team, very soon we expanded to a company with a team consisting of more than 40 specialists. Thus we were capable of participating in numerous major projects in Shipbuilding. Later on, we focused our efforts on Power Plant Design. Civil Engineering was just a logical continuation of our development. Now here is our new activity – 3D Laser Scanning, opening new horizons for our future progress. Enclosed below are our projects activities by years:

 
626 / BULK CARRIER
Client: Bulyard, Bulgaria
Started at: 2006
Completed at: 2006
Status: Completed
Pipe routing and arrangement in the Engine room
VULCANO / Chemical Tanker
Client: Gestec Injeneria y Systemas, Spain
Started at: 2006
Completed at: 2006
Status: Completed
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room and Cargo Area, including Main deck arrangement. Auxiliary steel structure design and modelling (gangway steel construction) in Cargo Area.

 
NB1358/1359 Ferry
Client: Aker Yard Turku, Finland
Started at: 2006
Completed at: 2007
Status: Completed
Design and detailed drawings of deck equipment, fitting-up, ladders, doors, stairs, rails and foundations. Ventilation Ducts routing and supports, Drain system routing and supports. Foundations for the windlasses. Supervision of production drawings.
H600 / Oil Rig
Client: Aker Yards Brevik, Norway
Started at: 2006
Completed at: 2007
Status: Completed
 
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room and Cargo Area. Special routing of Drilling System and Mud System. Auxiliary steel structure and supports design.
PR.22 / ROV
Client: Aker Yards Søvik, Norway
Started at: 2007
Completed at: 2007
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.
A124 / ROV
Client: Aker Yards Aukra, Norway
Started at: 2007
Completed at: 2007
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.
B718 / OSCV 06 L
Client: Aker Yards Søvik, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for systems in Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws .Pipe Arrangement drws.
A700 / ROV
Client: Aker Yards Aukra, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.
NB1363/1364 GENESIS Passenger Vessel
Client: Aker Yard Turku, Finland
Started at: 2007
Completed at: 2008
Status: Completed
Design and detailed drawings of deck equipment, fitting-up, manhole, ladders, doors, stairs, rails and foundations. Ventilation Ducts routing and supports, Drainsystem routing and supports, Cable Trays routing and supports. Special foundation design for the Life- Boats. Supervision of production drawings.
B154 / Offshore Vessel
Client: Aker Yards Brattvagg, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Positioning and modelling for equipments in Engine Room Line arrangements, routing and isometric drawing issues for hydraulic systems and systems in Engine room and Bow Thruster Room and Accommodation Area. Pipe Arrangement drws.
B724/725 AH12
Client: Aker Yards Brattvagg, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and modelling for  equipments in Engine Room and Bow Thruster Room.Pipe Line arrangements, routing and isometric drawing issues for systems in Engine room and Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws.
Fishing vessel
Client: Seacon AS Maloy, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room. Special systems for refrigeration on fishing vessels. Icemaker design.



 
B064/066 / ROV
Client: Aker Yards Brevik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and modelling for  the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for  the systems in Engine room and Bow Thruster Room.
B067 ROV
Client: Aker Yards Brevik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room.Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.
B702 / OSCV 06 L DSV
Client: Aker Yards Søvik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for the systems in Engine room and Bow Thruster Room. Design, routing and isometric issue of all Diving System pipes.
B705 / OSCV 06 L
Client: Aker Yards Søvik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Casing arrangement, calculations and foundations. Pipe Line arrangements, routing and isometric drawing issues for all the systems.
1679 / Multi Purpose Vessel
Client: FJELLSTRAND AS Oma, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe routing and foundations in the whole ship, pipe arrangements. Special foundations for Winches and HIPAP in Aluminium structure.
AYP285
Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.
AYP317
Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.
AYP319
Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.
B728 / PSV 09 CD
Client: Aker Yards Søvik, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Foundation modelling for the equipments in Engine Room and Bow Thruster Room.
B738 / PSV 09 LNG
Client: Aker Yards Søvik, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Foundation modelling for the equipments in Engine Room and Bow Thruster Room. Pipe Arrangement drawings.
A706 / ROV
Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Rolls Royce Tugger Winch System, Hydraulics routing and arrangement.
A707 / ROV
Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Rolls Royce Tugger Winch System, Hydraulics routing and arrangement.
A716 / ROV
Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Supervision of Fresh Water Cooling System. Pipe routing and arrangements, isometrics drawing issues.
B730 / OSCV 06 L
Client: Aker Yards Brattvagg, Norway
Started at: 2009
Completed at: 2010
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for systems in Engine room and Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue. Damper and suspension  foundations in Casing.
A752/775 PSV 09 CD
Client: STX OSV AS Aukra, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room Propulsion Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room and Accommodation. Pipe Arrangement drawings in Bow Thruster Room.

 
A759 / PSV 09 CD
Client: STX OSV AS Aukra, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room Propulsion Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room and Accommodation. Pipe Arrangement drawings in Bow Thruster Room.
Pr.13048 / Ferry
Client: STX OSV AS Langsten, Norway
Started at: 2010
Completed at: 2011
Status: Completed
PipeLine routing(new routing and reconstruction of existing pipes). Iso and pipe arrangement drawings. Foundation modelling and drws for  the equipments in Engine Room.
L753/754 / PSV 06 CD
Client: STX OSV AS Langsten, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room, Bow Thruster Room,Casing and Accommodation. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.
A764 / PSV 06 LNG
Client: STX OSV AS Aukra, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawigns.
B729 / PSV 09 L CD
Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Foundation modelling and drawings for the equipments in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawings.
B748 / PSV 09 L CD
Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Foundation modelling and drawings for the equipments in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawings.
L749 / PSV 08 CD
Client: STX OSV AS Langsten, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.
A778/780 PSV 05 MRV
Client: STX OSV AS Aukra, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room. Tank and Pipe Arrangement drawings.
B779 - PSV 05 MRV
Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room. Tank and Pipe Arrangement drawings.
B745 / UT515CD
Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Modeling of auxiliary structure and foundations. Layout drawings.
B783 / PSV 06 LNG
Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room, Casing, Cargo Rail and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawings issues for all the systems. Tank and Pipe Arrangement drawings.
B773 / PSV 09 L CD
Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings. Pipe Line arrangements and routing for all pipeline systems in  Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings.
B771 / OSCV 11
Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Pipe routings in Pumping room and Cargo Area. Hydraulic system routing and isometric drawings.
B761 / PSV 09 CD
Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Pipe Line arrangements and routing for all pipeline systems in Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings. Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings.
L769 / PSV 08 CD
Client: STX OSV AS Langsten, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drws in FWD part of the vessel.
1048 PSV 09 CD
Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2012
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. All drawings in FWD part of the vessel.
Rolls - Royce Unit
Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2012
Status: Completed
Modeling and arrangement of all equipment. Hydraulic pipes routing and isometric drawings.
USV 2012
Client: CORES Ltd. Varna, Bulgaria
Started at: 2012
Completed at: 2012
Status: Completed
Industrial design of floating device for intelligent information system for prediction and control of dredging spot. 3D model of the vessel (with all needed drawings), stability calculations and various decisions about equipment instalation.
N776 OSCV 11
Client: STX OSV AS Søvik, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Modeling and arrangement of all equipment. Arrangement drawings.
B793 OSCV 11 L
Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Pipe routing in Accommodation including Penetration and Coordination drawings. Pipe 3D Modeling and ISO drawings in Aft Ship.
B799 AHTS 12
Client: STX OSV AS Søvik, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Foundation modelling and production drawings for the all vessel equipment. Arrangement drawings. 3D pipe modeling and iso drawings.
B784 - UT 776 CD
Client: STX OSV AS Brevik - Noble Offshore, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Pipeline routing(new routing and reconstruction of existing pipes). Iso and pipe arrangement drws. Foundation modelling and drws for the equipments in Engine Room.
L815/L816 - PSV 07 CD
Client: STX Piping AS/Langsten, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings.
VSJ6257 - PSV 08 CD
Client: STX Trading AS Norway
Started at: 2012
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drws in FWD part of the vessel.
N817 - PSV 07 CD
Client: STX Piping AS/Aukra, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for the equipments in Engine Room, Casing and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Casing and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings. Foundation drawings.
B819 - CLV 01
Client: STX Piping AS/Brattvaag, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for the equipments in Engine Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room. Tank and Pipe Arrangement drws. Layout drawings. Foundation drawings.
B820 - OSCV 03
Client: STX Piping AS/Brattvaag, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.
B811 - OSCV06L
Client: VARD Piping AS, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings. Pipe Line arrangements and routing for all pipeline systems in  Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings.
N825 - OSCV 03
Client: VARD Group AS - Aukra, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room and Casing Area). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room and Casing Area.
N822 - OSCV 07
Client: VARD Group AS - Langsten, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings.
ZOUK 2007 - Diesel Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
DRILL SHIP
Client: ICEPRONAV ENGINEERING SRL
Started at: 2013
Completed at: 2014
Status: Completed
3D modeling and drawings of platforms, ladders and railings in Thruster trunks and Stair cases. Coordination drawings in tanks, thruster trunks, stair cases. 3D modeling of ladders in tanks.
N827 - PSV 06 LNG
Client: VARD Engineering, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Arrangement of Watertight Sliding doors, Chain lockers. Foundations for Windlasses and Tugger Winches.Cranes Arrangement drawings.
JIYEH 2008 - Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Power Plant modeling. Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (ISO drawings, support drawings, unit drawings etc.).
N794 - OSCV 11 L
Client: VARD Group AS - Brattvaag, Norway
Started at: 2013
Completed at: 2014
Status: Completed
Pipeline arrangements, routing and isometric drawings for all the systems in Accommodation. Penetration and Coordination drawings.
N800 - OSCV12L
Client: VARD Group AS - Søvik, Norway
Started at: 2013
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the Accommodation. Insulation and Panels. Pipeline arrangements, routing and isometric drawings for all the systems. All kind of drawings in the Superstructure.
2010 LISAHALLY - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
BRIGG 2011 - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
Surinam 2006 - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2014
Status: Completed
Equipment modeling and positioning. Arrangement and Production drawings.
2971 SLEAFORD - Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2014
Status: Completed
Equipment modeling and positioning. Arrangement and Production drawings.
N802 - AHTSV
Client: VARD Group AS - Brattvaag Shipyard
Started at: 2014
Completed at: 2015
Status: Completed
Modeling of auxiliary structure and foundations. Production drawings in FWD part of the vessel (Engine Room, Bow Thruster Room, Pump Room, Casing and Accommodation). Arrangement drawings. Layout drawings.
SNETTERTON - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2015
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe supports. Layout and Basic drawings, support drawings, unit drawings etc.
MIRAFLORES - Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2015
Status: Completed
Pipe supports. Layout and Basic drawings, support drawings, unit drawings etc.
N801 - DSCV
Client: VARD Group AS - Søvik, Norway
Started at: 2014
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Diving Area, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.
N818 - DSV
Client: VARD Group AS - Langsten, Norway
Started at: 2014
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of drawings in FWD part of the vessel.
N801 - DSCV
Client: VARD Group AS - Søvik, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Diving Area, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.
N818 - DSV
Client: VARD Group AS - Langsten, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of drawings in FWD part of the vessel.
N830 - OSCV
Client: VARD Group AS - Brattvaag, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the Accommodation. Insulation and Panels. Pipeline arrangements, routing and isometric drawings for all the systems. All kind of drawings in the Superstructure.
CAYMAN - Diesel Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2015
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
Biotricity - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2015
Completed at: 2015
Status: Completed
Preliminary layout drawings
WIDNES - Biomass Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, support drawings, unit drawings etc.).
Tilbury Green Power
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
As built drawings and documentation
KENT
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Pile design; Track modeling
Cramlington
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
RUBY Princess
Client: PRINCESS CRUISES
Started at: 2016
Completed at: 2016
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
CARIBBEAN Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
REGAL Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
ISLAND Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
GRAND Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
ROYAL Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
STAR Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
CORAL Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
 
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
CROWN Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
GOLDEN Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
EMERALD Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
DIAMOND Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
DAWN Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
MAJESTIC Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
PACIFIC Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
SAPPHIRE Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
SEA Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
SUN Princess
Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.
NB870 - Luxury Expedition Cruise Vessel
Client: VARD Group AS - Langsten, Norway
Started at: 2017
Completed at: -
Status: Still in progress
3D Pipe routing, HVAC routing, Stairs and Aux. Steel structures modeling. Complete set of Pipe production drawings, Coordination and Penetration drawings.
N822 - Pelagic Trawler
Client: VARD Group AS - Langsten, Norway
Started at: 2017
Completed at: -
Status: Still in progress
3D Pipe routing, HVAC routing, Foundation and other Aux. Steel structures modeling. Complete set of Pipe production drawings, Coordination and Penetration drawings.
K700 - Pipe Rack
Client: SOLVAY SODI S.A. - Bulgaria
Started at: 2017
Completed at: 2017
Status: Completed
Entire 3D Laser Scanning of Pipe Rack, complete 3D reverse engineering model of the rack. Full set of drawings issue. Detailed Basic Design and Detailed Design project documentation about Steel structure repair and reinforcement at site.
Benin - Diesel Power Plant
Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2017
Completed at: -
Status: Still in progress
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).
RUBY Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
CROWN Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
PACIFIC Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
GRAND Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
CARIBBEAN Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
ROYAL Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
REGAL Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: -
Status: Still in progress
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
STAR Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: -
Status: Still in progress
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.
EMERALD Princess
Client: PRINCESS CRUISES
Started at: 2018
Completed at: -
Status: Still in progress
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.