We are proud of our company’s development and rich history. Starting as a small team, very soon we expanded to a company with a team consisting of more than 40 specialists. Thus we were capable of participating in numerous major projects in Shipbuilding. Later on, we focused our efforts on Power Plant Design. Civil Engineering was just a logical continuation of our development. Now here is our new activity – 3D Laser Scanning, opening new horizons for our future progress. Enclosed below are our projects activities by years:

 

626 / BULK CARRIER

Client: Bulyard, Bulgaria
Started at: 2006
Completed at: 2006
Status: Completed
Pipe routing and arrangement in the Engine room. Arrangement and coordination drawings. Penetration drawings.

VULCANO / Chemical Tanker

Client: Gestec Injeneria y Systemas, Spain
Started at: 2006
Completed at: 2006
Status: Completed
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room and Cargo Area, including Main deck arrangement. Auxiliary steel structure design and modelling (gangway steel construction) in Cargo Area.

 

NB1358/1359 Ferry

Client: Aker Yard Turku, Finland
Started at: 2006
Completed at: 2007
Status: Completed
Design and detailed drawings of deck equipment, fitting-up, ladders, doors, stairs, rails and foundations. Ventilation Ducts routing and supports, Drain system routing and supports. Foundations for the windlasses. Supervision of production drawings.

H600 / Oil Rig

Client: Aker Yards Brevik, Norway
Started at: 2006
Completed at: 2007
Status: Completed
 
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room and Cargo Area. Special routing of Drilling System and Mud System. Auxiliary steel structure and supports design.

PR.22 / ROV

Client: Aker Yards Søvik, Norway
Started at: 2007
Completed at: 2007
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.

A124 / ROV

Client: Aker Yards Aukra, Norway
Started at: 2007
Completed at: 2007
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.

B718 / OSCV 06 L

Client: Aker Yards Søvik, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for systems in Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws .Pipe Arrangement drws.

A700 / ROV

Client: Aker Yards Aukra, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.

NB1363/1364 GENESIS Passenger Vessel

Client: Aker Yard Turku, Finland
Started at: 2007
Completed at: 2008
Status: Completed
Design and detailed drawings of deck equipment, fitting-up, manhole, ladders, doors, stairs, rails and foundations. Ventilation Ducts routing and supports, Drainsystem routing and supports, Cable Trays routing and supports. Special foundation design for the Life- Boats. Supervision of production drawings.

B154 / Offshore Vessel

Client: Aker Yards Brattvagg, Norway
Started at: 2007
Completed at: 2008
Status: Completed
Positioning and modelling for equipments in Engine Room Line arrangements, routing and isometric drawing issues for hydraulic systems and systems in Engine room and Bow Thruster Room and Accommodation Area. Pipe Arrangement drws.

B724/725 AH12

Client: Aker Yards Brattvagg, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and modelling for  equipments in Engine Room and Bow Thruster Room.Pipe Line arrangements, routing and isometric drawing issues for systems in Engine room and Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws.

Fishing vessel

Client: Seacon AS Maloy, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe routing, Ventilation Ducts routing, Cable Trays routing in Engine Room. Special systems for refrigeration on fishing vessels. Icemaker design.



 

B064/066 / ROV

Client: Aker Yards Brevik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and modelling for  the equipments in Engine Room and Bow Thruster Room. Pipe Line arrangements, routing and isometric drawing issues for  the systems in Engine room and Bow Thruster Room.

B067 ROV

Client: Aker Yards Brevik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room.Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine room and Bow Thruster Room. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue.

B702 / OSCV 06 L DSV

Client: Aker Yards Søvik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for the systems in Engine room and Bow Thruster Room. Design, routing and isometric issue of all Diving System pipes.

B705 / OSCV 06 L

Client: Aker Yards Søvik, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room. Casing arrangement, calculations and foundations. Pipe Line arrangements, routing and isometric drawing issues for all the systems.

1679 / Multi Purpose Vessel

Client: FJELLSTRAND AS Oma, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Pipe routing and foundations in the whole ship, pipe arrangements. Special foundations for Winches and HIPAP in Aluminium structure.

AYP285

Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.

AYP317

Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.

AYP319

Client: Aker Yards Projects AS Ålesund, Norway
Started at: 2008
Completed at: 2008
Status: Completed
Main Engine foundation drawings, corrected drawings according DNV comments.

B728 / PSV 09 CD

Client: Aker Yards Søvik, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Foundation modelling for the equipments in Engine Room and Bow Thruster Room.

B738 / PSV 09 LNG

Client: Aker Yards Søvik, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Foundation modelling for the equipments in Engine Room and Bow Thruster Room. Pipe Arrangement drawings.

A706 / ROV

Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Rolls Royce Tugger Winch System, Hydraulics routing and arrangement.

A707 / ROV

Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Rolls Royce Tugger Winch System, Hydraulics routing and arrangement.

A716 / ROV

Client: Aker Yards Aukra, Norway
Started at: 2009
Completed at: 2009
Status: Completed
Supervision of Fresh Water Cooling System. Pipe routing and arrangements, isometrics drawing issues.

B730 / OSCV 06 L

Client: Aker Yards Brattvagg, Norway
Started at: 2009
Completed at: 2010
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for systems in Engine room and Bow Thruster Room and Accommodation Area. Tank and Pipe Arrangement drws. Arrangement and pipe routing inside the Ship’s Funnel Casing including all the Exhaust pipeline routing and isometrics issue. Damper and suspension  foundations in Casing.

A752/775 PSV 09 CD

Client: STX OSV AS Aukra, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room Propulsion Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room and Accommodation. Pipe Arrangement drawings in Bow Thruster Room.

 

A759 / PSV 09 CD

Client: STX OSV AS Aukra, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room Propulsion Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room and Accommodation. Pipe Arrangement drawings in Bow Thruster Room.

Pr.13048 / Ferry

Client: STX OSV AS Langsten, Norway
Started at: 2010
Completed at: 2011
Status: Completed
PipeLine routing(new routing and reconstruction of existing pipes). Iso and pipe arrangement drawings. Foundation modelling and drws for  the equipments in Engine Room.

L753/754 / PSV 06 CD

Client: STX OSV AS Langsten, Norway
Started at: 2010
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room, Bow Thruster Room,Casing and Accommodation. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.

A764 / PSV 06 LNG

Client: STX OSV AS Aukra, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawigns.

B729 / PSV 09 L CD

Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Foundation modelling and drawings for the equipments in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawings.

B748 / PSV 09 L CD

Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Foundation modelling and drawings for the equipments in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drawings.

L749 / PSV 08 CD

Client: STX OSV AS Langsten, Norway
Started at: 2011
Completed at: 2011
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.

A778/780 PSV 05 MRV

Client: STX OSV AS Aukra, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room. Tank and Pipe Arrangement drawings.

B779 - PSV 05 MRV

Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Bow Thruster Room. Tank and Pipe Arrangement drawings.

B745 / UT515CD

Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Modeling of auxiliary structure and foundations. Layout drawings.

B783 / PSV 06 LNG

Client: STX OSV AS Brattvaag, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room, Casing, Cargo Rail and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawings issues for all the systems. Tank and Pipe Arrangement drawings.

B773 / PSV 09 L CD

Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings. Pipe Line arrangements and routing for all pipeline systems in  Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings.

B771 / OSCV 11

Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Pipe routings in Pumping room and Cargo Area. Hydraulic system routing and isometric drawings.

B761 / PSV 09 CD

Client: STX OSV AS Søvik, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Pipe Line arrangements and routing for all pipeline systems in Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings. Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings.

L769 / PSV 08 CD

Client: STX OSV AS Langsten, Norway
Started at: 2011
Completed at: 2012
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drws in FWD part of the vessel.

1048 PSV 09 CD

Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2012
Status: Completed
Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. All drawings in FWD part of the vessel.

Rolls - Royce Unit

Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2012
Status: Completed
Modeling and arrangement of all equipment. Hydraulic pipes routing and isometric drawings.

USV 2012

Client: CORES Ltd. Varna, Bulgaria
Started at: 2012
Completed at: 2012
Status: Completed
Industrial design of floating device for intelligent information system for prediction and control of dredging spot. 3D model of the vessel (with all needed drawings), stability calculations and various decisions about equipment instalation.

N776 OSCV 11

Client: STX OSV AS Søvik, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Modeling and arrangement of all equipment. Arrangement drawings.

B793 OSCV 11 L

Client: STX OSV Piping AS, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Pipe routing in Accommodation including Penetration and Coordination drawings. Pipe 3D Modeling and ISO drawings in Aft Ship.

B799 AHTS 12

Client: STX OSV AS Søvik, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Foundation modelling and production drawings for the all vessel equipment. Arrangement drawings. 3D pipe modeling and iso drawings.

B784 - UT 776 CD

Client: STX OSV AS Brevik - Noble Offshore, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Pipeline routing(new routing and reconstruction of existing pipes). Iso and pipe arrangement drws. Foundation modelling and drws for the equipments in Engine Room.

L815/L816 - PSV 07 CD

Client: STX Piping AS/Langsten, Norway
Started at: 2012
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings.

VSJ6257 - PSV 08 CD

Client: STX Trading AS Norway
Started at: 2012
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drws in FWD part of the vessel.

N817 - PSV 07 CD

Client: STX Piping AS/Aukra, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for the equipments in Engine Room, Casing and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Casing and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings. Foundation drawings.

B819 - CLV 01

Client: STX Piping AS/Brattvaag, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for the equipments in Engine Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room. Tank and Pipe Arrangement drws. Layout drawings. Foundation drawings.

B820 - OSCV 03

Client: STX Piping AS/Brattvaag, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Casing and Accommodation). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.

B811 - OSCV06L

Client: VARD Piping AS, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Auxiliary structure and foundations drawings. Layout drawings. Pipe arrangement drawings. Pipe Line arrangements and routing for all pipeline systems in  Accommodation. Positioning and modelling for all the equipments in Accommodation. Penetration and Coordination drawings.

N825 - OSCV 03

Client: VARD Group AS - Aukra, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room and Casing Area). Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Bow Thruster Room and Casing Area.

N822 - OSCV 07

Client: VARD Group AS - Langsten, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Positioning and foundation modelling for all the equipments in Engine Room and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room and Bow Thruster Room. Tank and Pipe Arrangement drws. Layout drawings.

ZOUK 2007 - Diesel Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

DRILL SHIP

Client: ICEPRONAV ENGINEERING SRL
Started at: 2013
Completed at: 2014
Status: Completed
3D modeling and drawings of platforms, ladders and railings in Thruster trunks and Stair cases. Coordination drawings in tanks, thruster trunks, stair cases. 3D modeling of ladders in tanks.

N827 - PSV 06 LNG

Client: VARD Engineering, Norway
Started at: 2013
Completed at: 2013
Status: Completed
Arrangement of Watertight Sliding doors, Chain lockers. Foundations for Windlasses and Tugger Winches.Cranes Arrangement drawings.

JIYEH 2008 - Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Power Plant modeling. Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (ISO drawings, support drawings, unit drawings etc.).

N794 - OSCV 11 L

Client: VARD Group AS - Brattvaag, Norway
Started at: 2013
Completed at: 2014
Status: Completed
Pipeline arrangements, routing and isometric drawings for all the systems in Accommodation. Penetration and Coordination drawings.

N800 - OSCV12L

Client: VARD Group AS - Søvik, Norway
Started at: 2013
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the Accommodation. Insulation and Panels. Pipeline arrangements, routing and isometric drawings for all the systems. All kind of drawings in the Superstructure.

2010 LISAHALLY - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

BRIGG 2011 - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2013
Completed at: 2014
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

Surinam 2006 - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2014
Status: Completed
Equipment modeling and positioning. Arrangement and Production drawings.

2971 SLEAFORD - Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2014
Status: Completed
Equipment modeling and positioning. Arrangement and Production drawings.

N802 - AHTSV

Client: VARD Group AS - Brattvaag Shipyard
Started at: 2014
Completed at: 2015
Status: Completed
Modeling of auxiliary structure and foundations. Production drawings in FWD part of the vessel (Engine Room, Bow Thruster Room, Pump Room, Casing and Accommodation). Arrangement drawings. Layout drawings.

SNETTERTON - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2015
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe supports. Layout and Basic drawings, support drawings, unit drawings etc.

MIRAFLORES - Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2014
Completed at: 2015
Status: Completed
Pipe supports. Layout and Basic drawings, support drawings, unit drawings etc.

N801 - DSCV

Client: VARD Group AS - Søvik, Norway
Started at: 2014
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Diving Area, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.

N818 - DSV

Client: VARD Group AS - Langsten, Norway
Started at: 2014
Completed at: 2014
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of drawings in FWD part of the vessel.

N801 - DSCV

Client: VARD Group AS - Søvik, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Diving Area, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All drawings in FWD part of the vessel.

N818 - DSV

Client: VARD Group AS - Langsten, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of drawings in FWD part of the vessel.

N830 - OSCV

Client: VARD Group AS - Brattvaag, Norway
Started at: 2015
Completed at: 2015
Status: Completed
Positioning and foundation modelling for all the equipments in the Accommodation. Insulation and Panels. Pipeline arrangements, routing and isometric drawings for all the systems. All kind of drawings in the Superstructure.

CAYMAN - Diesel Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2015
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

Biotricity - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2015
Completed at: 2015
Status: Completed
Preliminary layout drawings

WIDNES - Biomass Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, support drawings, unit drawings etc.).

Tilbury Green Power

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
As built drawings and documentation

KENT

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Pile design; Track modeling

Cramlington

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2016
Completed at: 2017
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

RUBY Princess

Client: PRINCESS CRUISES
Started at: 2016
Completed at: 2016
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

CARIBBEAN Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

REGAL Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

ISLAND Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

GRAND Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

ROYAL Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

STAR Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

CORAL Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
 
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

CROWN Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

GOLDEN Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

EMERALD Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

DIAMOND Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

DAWN Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

MAJESTIC Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

PACIFIC Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

SAPPHIRE Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

SEA Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

SUN Princess

Client: PRINCESS CRUISES
Started at: 2017
Completed at: 2017
Status: Completed
Preparation of drawings and diagrams of certain ship systems issued as “On Board” and “As Built” documentation. Generation of Equipment and System Schematics for educational and familiarization purposes.

NB870 - Luxury Expedition Cruise Vessel

Client: VARD Group AS - Langsten, Norway
Started at: 2017
Completed at: 2018
Status: Completed
3D Pipe routing, HVAC routing, Stairs and Aux. Steel structures modeling. Complete set of Pipe production drawings, Coordination and Penetration drawings.

N822 - Pelagic Trawler

Client: VARD Group AS - Langsten, Norway
Started at: 2017
Completed at: 2018
Status: Completed
3D Pipe routing, HVAC routing, Foundation and other Aux. Steel structures modeling. Complete set of Pipe production drawings, Coordination and Penetration drawings.

K700 - Pipe Rack

Client: SOLVAY SODI S.A. - Bulgaria
Started at: 2017
Completed at: 2017
Status: Completed
Entire 3D Laser Scanning of Pipe Rack, complete 3D reverse engineering model of the rack. Full set of drawings issue. Detailed Basic Design and Detailed Design project documentation about Steel structure repair and reinforcement at site.

Benin - Diesel Power Plant

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2017
Completed at: 2019
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.).

RUBY Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

CROWN Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

PACIFIC Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

GRAND Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

CARIBBEAN Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

ROYAL Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

REGAL Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

STAR Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2018
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

EMERALD Princess

Client: PRINCESS CRUISES
Started at: 2018
Completed at: 2019
Status: Completed
Save all System inspection onboard - system study, tracing, measuring, marking, plan preparation. Diagram layouts on the machinery space of Save all System as built. Full (3D) Scan and Point Cloud 3D file of Bilge Treatment System - Full System inspection and 3D Scanning on board. Point Cloud 3D file has been prepared. Drawings As Fitted - Update of existing Bilge Treatment System Drawing (2D Plan Layout) according to the 3D Scan survey.

NB871

Client: VARD Group AS - Langsten, Norway
Started at: 2018
Completed at: 2018
Status: Completed
Positioning of  equipment, pipe routing and steel outfitting modelling in accommodation area. All kind of foundations and auxiliary structures modelling. Coordination and arrangement drawings issue.

NB884

Client: VARD Group AS - Brattvaag, Norway
Started at: 2018
Completed at: 2018
Status: Completed
Complete 3D Design of all Casing Area - Platforms, Ladders and Stairs, Foundations and all other auxiliary structures. Pipe routing, HVAC routing. Pipe isometric and arrangement drawings. Prefabrication drawings for all aux. steel structures.

MV OSPREY

Client: OHT AS, Norway
Started at: 2018
Completed at: 2018
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

MV HAWK

Client: OHT AS, Norway
Started at: 2018
Completed at: 2018
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

MV ALBATROSS

Client: OHT AS, Norway
Started at: 2018
Completed at: 2018
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

MV EAGLE

Client: OHT AS, Norway
Started at: 2018
Completed at: 2019
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

MV FALCON

Client: OHT AS, Norway
Started at: 2018
Completed at: 2019
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

MV DRUJBA

Client: PB MANAGEMENT Ltd.
Started at: 2019
Completed at: -
Status: Still in progress
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

DYNAMIQ GTT-135

Client: C-Job Nikolayev LLC
Started at: 2019
Completed at: 2019
Status: Completed
Positioning and foundation modelling for all the equipment in Engine Room. 3D Pipe routing and isometric drawings issue for all the systems in Engine room. Pipe arrangement drawings and Penetration drawings issue.

MV CARMELIA

Client: Marino Consulting Ltd.
Started at: 2019
Completed at: 2019
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

MV BERGAMA

Client: Marine Tankers Shipmanagement Ltd.
Started at: 2019
Completed at: 2019
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

MV ATLANTIS DWELLER

Client: FUGRO
Started at: 2019
Completed at: 2019
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

MV MELKART 4 / FISHING VESSEL

Client: Industrikulde AS Norway
Started at: 2020
Completed at: 2020
Status: Completed
3D Laser Scanning and Design Retrofit Process for Refrigerated Sea Water (RSW) system instasllation. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment for Amonia refrigerant. Detailed engineering.  Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

2016 TILBURY GREEN POWER

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2020
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

2031 HOO HOOTON PARK WASTE ENERGY

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2021
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

2044 GHENT

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2021
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

2046 SURINAME UNIT 5&6

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2020
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

3668 PUERTOLLANO II

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2021
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

3673 DIEMEN

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2020
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

857 FLU UNITS

Client: Rockwool
Started at: 2020
Completed at: -
Status: Still in progress
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

MV AKADEMIK CHERSKIY - BWTS system

Client: BUL SHIPYARDS AGENCY
Started at: 2020
Completed at: 2020
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

NB517 vessel

Client: WBE Western Baltic Enginering
Started at: 2020
Completed at: 2020
Status: Completed
Complete HULL design - 3D model, Fabrication drawings, Nesting, Calculations. Full design package according to the Shipyard standards and requirements.

FAIRLEAD ROLLERS, MV HAWK & OSPREY

Client: OHT Technical Management
Started at: 2020
Completed at: 2020
Status: Completed
Fairlead Rollers 3D Model, position onboard, hull/deck reinforcement. Calculations and software load simulations. Steel drawings and arrangement drawings.

FLU UNITS Switzerland

Client: Rockwool
Started at: 2020
Completed at: -
Status: Still in progress
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

FLE8

Client: Rockwool
Started at: 2020
Completed at: 2021
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

M/T DELTA SEA - BWTS system

Client: MARINO CONSULTING Ltd.
Started at: 2020
Completed at: 2020
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

PHT and NRT TUNNELS

Client: GEOMAAT
Started at: 2020
Completed at: 2020
Status: Completed
Complete, precise 3D modeling, reverse engineering and drawings issue using information from a given scanned and processed Point cloud. Complete and precise object recreation in area into and around main road tunnels in Netherland.

SOI - Cooling Units

Client: Rockwool
Started at: 2020
Completed at: 2020
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

VROON-VOS STAR & START - BWTS system

Client: NAVALTEX ENGINEERING LTD.
Started at: 2020
Completed at: 2020
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

VROON-VOS STONE & SUGAR - BWTS system

Client: NAVALTEX ENGINEERING LTD.
Started at: 2020
Completed at: 2020
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

WIDNES 2013

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2020
Completed at: 2021
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe and cable trays routing - 3D Modeling and pipe and cable trays supports. All kind of drawings (Layout and Basic drawings, ISO drawings, support drawings, unit drawings etc.). Basic Design secondary steel.

FAIRLEAD ROLLERS, MV EAGLE & FALCON

Client: OHT Technical Management
Started at: 2021
Completed at: 2021
Status: Completed
Fairlead Rollers 3D Model, position onboard, hull/deck reinforcement. Calculations and software load simulations. Steel drawings and arrangement drawings.

M/V EAGLE - BWTS system

Client: OHT Technical Management
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

M/V FALCON - BWTS system

Client: OHT Technical Management
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

M/V OSPREY - BWTS system

Client: OHT Technical Management
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv Adelia tanker - bwts system

Client: MARINO CONSULTING Ltd.
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv Alexandria - bwts system

Client: MARINO CONSULTING Ltd.
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv olvia - bwts system

Client: MARINO CONSULTING Ltd.
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv Tzarevich - bwts system

Client: NAVIBORN Ltd.
Started at: 2021
Completed at: 2021
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv RINA - BWTS SYSTEM

Client: WESTERN BALTIC ENGINEERING
Started at: 2022
Completed at: 2022
Status: Completed
BALLAST WATER TREATMENT System implementation - Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv FRISIAN INO - BWTS SYSTEM

Client: WESTERN BALTIC ENGINEERING
Started at: 2022
Completed at: 2022
Status: Completed
BALLAST WATER TREATMENT System implementation - Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv ONYX - BWTS SYSTEM

Client: WESTERN BALTIC ENGINEERING
Started at: 2022
Completed at: 2022
Status: Completed
BALLAST WATER TREATMENT System implementation - Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

FLU23

Client: Rockwool
Started at: 2022
Completed at: 2023
Status: Completed
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

MV PANTONIO - BWTS SYSTEM

Client: WESTERN BALTIC ENGINEERING
Started at: 2022
Completed at: 2023
Status: Completed
BALLAST WATER TREATMENT System implementation - Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv Ludovica - Scrubber Retrofit

Client: WARTSILA Ship Design
Started at: 2022
Completed at: 2023
Status: Completed
Design Retrofit Process for Scrubber system. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

KASSO - 'POWER-TO-X' PIPING & OUTFITTING DESIGN

Client: European Energy
Started at: 2022
Completed at: -
Status: Still in progress
Pipe systems routing, outfitting database preparation. Pipeline detailed design, isometric drawings issue, arrangement drawings. Pipe support, foundations and steel structures modeling. Specification and Bill of materials.

Made - Outfitting Deisgn

Client: European Energy
Started at: 2023
Completed at: -
Status: Still in progress
Pipe systems routing, outfitting database preparation. Pipeline detailed design, isometric drawings issue, arrangement drawings. Pipe support, foundations and steel structures modeling. Specification and Bill of materials.

KENT

Client: Burmeister & Wain Scandinavian Contractor A/S, Denmark
Started at: 2023
Completed at: -
Status: Still in progress
Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. All kind of drawings (Layout and Basic drawings, support drawings, unit drawings etc.).

Princess Cruises 36 vessel calibration

Client: Princess Cruises
Started at: 2023
Completed at: 2023
Status: Completed
36 vessels of Princess Cruises fleet -  Annual calibration, verification, inspection of Ballast Water Treatment System ( BWTS ) on board.

mv DAGMAR - SCRUBBER installation design

Client: Hartmann Gas Carriers
Started at: 2023
Completed at: 2023
Status: Completed
3D Laser Scanning and Design Retrofit Process for Scrubber system. Scanning of potential areas designated for retrofit. Post processing point cloud. 3D virtual installation of new pipes an equipment. Detailed engineering (Class package and piping production drawings). Final Calculation of Pressure losses and new flow rates of Exhaust system. Arrangement drawings for the new equipment. Isometric and fabrication drawings for piping. Construction drawings for foundations. Lightweight&CoG change calculations.

CGAS Saturn - BWTS System

Client: Hartmann Gas Carriers
Started at: 2023
Completed at: 2023
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

ROE6

Client: Rockwool
Started at: 2023
Completed at: -
Status: Still in progress
SKIDs design - Equipment modeling and positioning at 3D Model. Pipe routing - 3D Modeling and pipe supports. Aux steel structures design. All kind of drawings (Layout and Basic drawings, ISO drawings, Support drawings, Arrangements, etc.).

mv EAGLE

Client: OHT Technical Management
Started at: 2023
Completed at: 2023
Status: Completed
New Gen Sets installation and design - Equipment and Pipe systems Conceptual Design. Complete 3D model of all new elements – model and positioning of equipment, model of supports, foundations, pipe routing. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Pipe arrangement drawing, Installation Reports and Bill of Materials.

mv HAWK - BWTS System

Client: OHT Technical Management
Started at: 2023
Completed at: 2023
Status: Completed
BALLAST WATER TREATMENT System implementation - 3D Laser Scanning on board. Processing of the performed scans and preparing a complete unified Point Cloud. Equipment and Pipe system Conceptual Design. Revisions of all Class Approved drawings. Complete 3D model of all new elements – model and positioning of all equipment, model of supports, foundations and additional platforms, pipe routing. Model and position of new electrical cabinets, foundations for cabinets, Cable Trays routing about BWTS electrical supply. Full package prefabrication drawings – Foundation drawings, Pipe Isometric drawings (ISOs), Final Equipment Layout drawing, Pipe arrangement drawing, Installation Reports and Bill of Materials.

N962

Client: VARD Engineering, Constanta
Started at: 2023
Completed at: -
Status: Still in progress
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of prefabrication drawings.

N963

Client: VARD Tulcea
Started at: 2024
Completed at: -
Status: Still in progress
Positioning and foundation modelling for all the equipments in the vessel (Engine Room, Bow Thruster Room, Propulsion Room, Pump Room, Casing and Accommodation). Pipeline arrangements, routing and isometric drawings for all the systems in Engine Room, Bow Thruster Room,Casing and Accommodation. All kind of prefabrication drawings.